Status: Completed 2024

Client: Bloom Early Education

Location: Beechboro

Builder: Tydan Constructions

Photographer: Austin Grader

The building is constructed from steel framing that enables to building’s structure to be constructed efficiently. The buildings’ plan is efficient and wraps around in an L-shape plan, allowing each room to have connection to lush and cool outside play area. The windows are playful, triangles and circulates, varying in shape and size.